联系方式

  • QQ:99515681
  • 邮箱:99515681@qq.com
  • 工作时间:8:00-23:00
  • 微信:codinghelp

您当前位置:首页 >> Python编程Python编程

日期:2021-06-06 10:09

22/02/2021 v1.2

Overview

The Fully Unreal Reality (FUR) company took another offer of design instead of your submission.

Unfortunately, the company that was picked for the design did complete the design but was unable

to implement the network completely due to time constraints and budget issues. You were brought

on once again as a consultant and asked to implement the network that the other company

designed. To keep things simple, the Melbourne head office is not being fully implemented in the

design given because it is the same as the Sydney office. You will be expected to use the skills that

you have gained throughout the past weeks to configure a network and document tests and IP

addressing.

Deliverables

You will be required to complete three deliverables and include them in your submission:

? IP addressing scheme (Excel Spreadsheet or Word Document/PDF).

? Test documentation (Excel Spreadsheet or Word Document/PDF).

? Completed network configuration (Packet Tracer file).

Weighting

IP addressing scheme 2.5%

Basic configuration 2.5%

VLANs & VTP 3.75%

IP addressing implementation 1.25%

OSPF & Routing 3.75%

DHCP 2.5%

NAT 2.5%

ACLs 3.75%

Testing 2.5%

Configuration Guide

Below you will find some helpful steps to follow in order to assist you with configuring the network.

You may find that you do not want to do the steps in the order they are presented in, the order is up

to you to determine. The configuration is complete when all steps have been completed in the order

presented, or your own order.

To start, download the associated Packet Tracer file available on Learnonline. This includes the

devices and the layout of the network along with all connections already completed. See Figure 1 for

an overview of the supplied Packet Tracer file.

Figure 1 - FUR Network Overview

Step 1 – IP addressing scheme.

? This must be done before you start. If the IP addressing scheme documentation is not

included in your submission you will get zero for this section.

? Your IP addressing scheme must include an IP assignment table. See your practicals for an

example of this type of table.

? Melbourne is represented by a single subnet. The single PC needs its own IP address in the

Melbourne LAN subnet.

? Use 10.0.0.0/8 for internal addressing:

o The second octet represents the location (1 = Sydney, 2 = Adelaide, 3 = Melbourne,

255 = other IP addressing).

o The third octet represents the VLAN.

22/02/2021 v1.2

o The fourth octet represents the hosts.

o For example, 10.2.50.5: 2 = Adelaide, 50 = VLAN ID, 5 = Host.

Step 2 – Implement basic configuration.

On switches and routers perform the following:

? Set hostnames and domain name (fur.com.au)

? Disable IP domain lookup.

? Configure enable password (“class”).

? Configure password for console (“cisco”).

? Configure a user account named “admin” with password “cisco”.

? Create RSA key.

? Configure password for VTY (“cisco”) and only allow SSH connections.

? Encrypt all passwords.

Step 3 – Implement VLANs & VTP.

? VLANs are implemented as groups of devices, one per group. For example: management –

for switch management VLAN, Servers, HR & Finance, Art, Wi-Fi, Cameras and more.

? Configure the distribution switch in Sydney with the VLANs and set it as VTP server and the

access switches as VTP clients.

? Configure the access switch in Adelaide with the VLANs.

? Configure access ports to be in the correct VLAN.

? Shut down all unused ports and move them into a blackhole/unused VLAN.

? Configure management SVI’s on each switch.

? Configure trunk links as appropriate and change the native VLAN.

Step 4 – Implement IP addressing.

? Configure each interface with their IP address information according to your scheme.

? Configure sub-interfaces on the Adelaide router and SVIs on the distribution switch in

Sydney.

? The ISP router already has the IP address configured on the serial link to Sydney. The Sydney

link to the ISP has already been configured. You do not need to change the link between the

Sydney office and the ISP router.

? Use private IP addresses for the WAN links between locations excluding the ISP.

? End devices (PC, laptop, tablet, camera) should not have IP addressing because they will get

their IP addresses through DHCP.

? Configure static IP addresses for the servers and printers as well as the Admin PC’s. Admin

PC’s should be placed into the Management VLAN.

? Admin PC’s can be used to test the management VLAN through SSHing to switches to

manage them.

Step 5 – Implement OSPF and routing.

? Configure OSPF on the 3 routers (Adelaide, Sydney and Melbourne). DO NOT configure OSPF

on the ISP router.

? Configure OSPF on the distribution switch in Sydney.

? Configure default routes as appropriate.

Step 6 – Implement DHCP.

? DHCP is done from the distribution switch in Sydney (dist.mls1.syd) to every device in the

network.

? Configure your DHCP pools according to your subnets defined in Step 1.

? Configure excluded addresses to ensure no IP conflicts occur.

? Configure the IP helper address in the Adelaide and Melbourne locations so devices there

can receive their IP addressing information from the distribution switch in Sydney.

? Configure all end devices (excluding printers and servers) to obtain their IP addressing

information through DHCP.

Step 7 – Implement NAT.

? Packets destined for the ISP must be passed through NAT to avoid leaking private IP

addresses to the ISP. Use the external IP address of the network (205.169.255.6) and

implement PAT.

? Add a static NAT for the web server using the IP address 205.169.255.8.

Step 8 – Implement ACLs.

? Devices on the Training Wi-Fi should not be able to access other devices on the network

except for the Internet.

? The web server should be accessible when connecting from the ISP test server to the web

server in FUR on port 80 and 443.

? The HR & Finance department should be isolated from all devices and the Internet. This

means HR & Finance should not have access to the ISP server or the ISP, nor any internal

devices.

? Only the Admin PC’s should be able to SSH to the switches for remote management.

Step 9 – Verify the network connectivity.

? The ISP server can be used to test the network connectivity (192.168.1.2). Use it to

effectively test the network and server access.

? You can also use the Admin PC’s to test the management VLANs and SSH connectivity to

switches.

? Your tests should demonstrate the ACL’s, NAT, and DHCP features of the network, along

with general connectivity.

? Tests should be documented and included in your submission. If no testing is documented,

you will receive zero for this section.

? It is recommended to test at the end of each step to ensure configuration is working before

proceeding to the next step.

Tests should be documented in a table like the following:

Test Name Source Destination Result Expected Result Reason

Ping to ISP

from HR PC

HR & Finance

Syd

ISP Server Fail Fail ACL blocks

Internet

access.


版权所有:留学生编程辅导网 2020 All Rights Reserved 联系方式:QQ:99515681 微信:codinghelp 电子信箱:99515681@qq.com
免责声明:本站部分内容从网络整理而来,只供参考!如有版权问题可联系本站删除。 站长地图

python代写
微信客服:codinghelp